Site survey, scaffold design, method statement, erection, sign-off.
Every job gets a site visit before a quote. We measure, photograph access, and note the obstacles — overhead cables, tight drives, listed fabric, neighbouring property.
Scaffold design follows TG20:21 for standard jobs. For anything non-standard — cantilevers, bridges, public-highway licences — you get a bespoke TG30 drawing from our designer and a method statement keyed to the site.
Full public-liability certs and CITB paperwork emailed with the quote. The scaffold goes up, gets tagged, and you get a handover inspection report the same day.
- CISRS-carded erectors on every job
- TG20 or bespoke TG30 design
- Method statement & risk assessment
- Public highway licences arranged
- Scafftag and handover inspection